Generac V20 Lights-up Collé Rental & Sales throughout

Aug 19, 2021
admin
Generac V20 Lights-up Collé Rental & Sales throughout

Dutch based Collé Rental & Sales, distributes products throughout The Netherlands, Belgium and Germany and has built a strong reputation in the construction sector spanning more than 120 years. This latest order from Generac Mobile® will further enhance its lighting tower range with innovative and contemporary lighting towers.

The new V20 lighting tower was launched by Generac Mobile®, earlier this year, to celebrate the company’s long-standing reputation as the leading lighting tower manufacturer for 20 years.

This latest model from Generac Mobile® blends sleek, contemporary Italian design with powerful performance, and robust structure.

The gull-winged doors, not only give this lighting tower an iconic and exclusive look but are practical, to give compactness and provide complete 360 access to the engine for easy maintenance, whilst the back door provides access to the control panel. Compact in design, it allows 14 units to be transported on a flatbed lorry.

As one of the quietest lighting towers on the market, with just 58 db(A) at 7-metres noise level, the Generac V20 can offer up to 180 hours of operation by harnessing fuel efficiency from the Kubota engine and efficient LED lamp heads.

We found that many of our customers were looking to reinvest in their fleets with state of the art and efficient products. This demand coupled with new government initiatives to support infrastructure and construction projects, presented us with enough market intelligence and we felt it was an ideal time to invest and introduce new products, which would also complement our existing brand portfolio.

The V20 from Generac Mobile® blends sleek, contemporary Italian design with powerful performance, and robust structure.

During the product design and production process the Generac Mobile® team focused on creating and manufacturing a product with extremely low fuel consumption and low carbon emissions, improved visibility and access for service.

For this project, a premium 6 x 12 m self-contained Generac DF Ecology Wash Rack, with a 15 tonne capacity and special side loading ramps for forklift access, was chosen to promote efficient water use and help the company meet environmental protection codes against contamination of soil and water systems from oils and hydrocarbons when cleaning equipment.

The Middle East is proactively adopting measures and implementing new practices to improve sustainable water management across the territory which it views as critical to its future development and vital in response to the challenges of global warming (Source: World Bank).

The DF Wash Rack range not only helps to reduce water costs but offers an environmentally friendly cleaning system where more than 80% of the water is recycled through a filtration system.

One of the key advantages of the Generac Wash Rack System is that the system can be built in modular form. This enables every customer to spec and scale their wash rack according to their site requirements and fit the space available.

Key features of the Byrne unit included adding two double pumps with each double pump transferring dirty water into the filtration system.

Due to the high volume of dust on the site, Generac developed this special model with a double filtration system and double decanter tank. This created an effective “two-in-one” Wash Rack with two different filtration systems working in parallel, providing high volumes of clean water, up to 36 litres per minute, to a single high-pressure washer.

The pressure washers work simultaneously cleaning and hosing down fleets and allowing two people to work together in one wash rack unit.


Share this article

A PHP Error was encountered

Severity: Notice

Message: Trying to access array offset on value of type null

Filename: models/Admindao.php

Line Number: 0

Backtrace:

File: /www/wwwroot/generac.giaodienmau.com/application/modules/Techsystem/models/Admindao.php
Line: 0
Function: _error_handler

File: /www/wwwroot/generac.giaodienmau.com/application/hooks/preprocess.php
Line: 31
Function: checkPermissionAction

File: /www/wwwroot/generac.giaodienmau.com/application/hooks/preprocess.php
Line: 103
Function: addAnalytic

File: /www/wwwroot/generac.giaodienmau.com/application/core/MY_Hooks.php
Line: 0
Function: replaceHtml

File: /www/wwwroot/generac.giaodienmau.com/application/core/MY_Hooks.php
Line: 0
Function: _run_hook

File: /www/wwwroot/generac.giaodienmau.com/index.php
Line: 327
Function: require_once